🏳️‍⚧️ trans rights are human rights 🏳️‍⚧️
Theme
◀
▶

The Missing “N” Behind Bedoukian’s $2,700 EPA Settlement

Environmental enforcement EPA Region 9

EPA alleged that an imported horse-fly trap carried the wrong establishment number. A final consent order imposed one civil penalty, while leaving the quantity of products and the precise corrective action outside the public record.

Filed September 2, 2026Docket FIFRA-09-2026-0135Expedited settlement and final order

What the order says

  • EPA alleged that Bedoukian Research imported the H Trap Professional Horse Fly Control System through the Los Angeles and Long Beach seaport on May 27, 2026.
  • The label displayed establishment number 92752-CH-1. EPA said the correct number was 92752-CHN-1.
  • Because the product claimed to catch and control horse flies, EPA treated it as a pest-control device regulated under the Federal Insecticide, Fungicide, and Rodenticide Act.
  • The final order assessed a $2,700 civil penalty for one alleged unlawful distribution or sale of a misbranded device.
  • Bedoukian consented to the penalty and waived its right to contest the case, but neither admitted nor denied the factual allegations.
  • The order does not identify the number of traps involved, describe a performance defect, or allege injury to people or the environment.

The enforcement action turns on a one-letter labeling discrepancy, but the public document does not explain how the error occurred.

$2,700Civil penalty imposed by the final order
1Alleged unlawful distribution or sale cited by EPA
30 daysPayment period measured from the order’s filing date
1 letterDifference between the displayed and required establishment numbers

One letter separated the label from the registered establishment

The difference was an “N.” EPA alleged that Bedoukian Research imported a horse-fly trap whose label showed 92752-CH-1, rather than the establishment number 92752-CHN-1 for the EPA-registered facility where the device was produced.

The product was the H Trap Professional Horse Fly Control System. According to the order, its label called it a “Horse Fly Control System,” said it was “for catching tabanids,” and claimed to offer “effective and easy control of horse flies (tabanids).” Those pest-control claims mattered because FIFRA defines a regulated device to include an instrument intended to trap, destroy, repel, or mitigate a pest.

“effective and easy control of horse flies (tabanids)”

Product-label language quoted in the EPA order

FIFRA makes it unlawful to distribute or sell a misbranded device. The order states that a device may be misbranded when its label does not carry the establishment number of the final EPA-registered establishment where it was produced. EPA applied that rule to the number on this label.

The word “sale” does not necessarily mean the order documents a retail purchase by a consumer. The statutory definition quoted in the agreement is broader. It includes holding for shipment, shipping, delivering, and receiving and then delivering or offering to deliver. The single count also does not establish that only one physical trap was involved. The order does not disclose the quantity in the shipment.

What Bedoukian accepted, and what it did not admit

The settlement became a final order when it was filed with EPA’s Regional Hearing Clerk on September 2, 2026. It requires Bedoukian to pay $2,700 within 30 days and prevents the company from claiming the payment or related interest as an income-tax deduction.

Bedoukian agreed to

  • Accept EPA’s jurisdiction over the company and the alleged conduct.
  • Consent to the civil penalty.
  • Waive the right to contest the allegations or appeal the final order.
  • Waive defenses that could have moved the matter into federal court.

The agreement does not say

  • That Bedoukian admitted the factual allegations.
  • That the trap failed to catch horse flies.
  • That a consumer was injured or financially harmed.
  • That environmental damage occurred.

The distinction is explicit. Bedoukian “neither admits nor denies” the factual allegations, even as it accepts the penalty and gives up the right to challenge them. The order therefore documents a binding settlement, not a litigated factual finding after a trial.

EPA also stated that if Bedoukian declined the expedited agreement, the agency could pursue more formal enforcement and seek up to $24,885 per violation, adjusted for inflation. That larger figure was a stated potential maximum, not the penalty imposed.

  1. EPA alleged that Bedoukian imported the H Trap in a specified entry at the Los Angeles and Long Beach seaport.

  2. The respondent’s representative, EPA enforcement official, and regional judicial officer signed the agreement or final order.

  3. The order was filed at 4:23 p.m. and became effective upon filing.

The public order stops short of the corrective details

Paragraph 19 says Bedoukian certified under penalty of perjury that it had supplied a detailed explanation of how compliance was achieved. That explanation was supposed to identify the date, location, action taken, quantity of product brought into compliance, and supporting information such as product images. If correction was not possible, the company was to report steps intended to prevent another violation.

The seven-page order does not reproduce that submission. As a result, the supplied record does not show whether the products were relabeled, withheld, returned, or handled another way. It also does not reveal how many units were involved or what caused the establishment number to be printed incorrectly.

What remains unknown from this record

  • The number of H Trap units in the import entry.
  • The origin of the discrepancy between CH and CHN.
  • The exact action used to bring the product into compliance.
  • Whether any units reached end users before the issue was addressed.

This is a labeling case, not a documented injury case

The order does not allege that the H Trap malfunctioned, contained a hazardous substance, injured a person, or damaged the environment. It focuses on whether a pest-control device carried the establishment identifier required by federal law.

That limitation matters. Calling the product “misbranded” is a legal characterization tied here to the establishment number. It should not be read as an EPA finding that every product claim was false or that the trap itself was unsafe.

At the same time, the one-character difference was not treated as optional paperwork. EPA alleged a federal violation, obtained a final order, and required both a penalty and a certified compliance explanation. The settlement resolves Bedoukian’s federal civil-penalty liability only for the violation and facts alleged in this matter.

The record tells a narrow but complete enforcement story: one imported entry, one disputed label identifier, one settled count. It establishes how EPA treated the discrepancy. It does not establish the shipment’s scale, the cause of the error, or harm to consumers or the environment.

Source: U.S. Environmental Protection Agency Region 9, Expedited Settlement Agreement and Final Order, In the Matter of Bedoukian Research, Inc., Docket No. FIFRA-09-2026-0135, seven pages, filed September 2, 2026. No external source documents were supplied or used.

Editorial and technical validation
  • Claims were checked against all seven supplied pages, including the signature page.
  • EPA allegations, settlement terms, and Bedoukian’s non-admission were distinguished.
  • The company’s documented position is represented through the signed agreement. No separate public statement was supplied.
  • No personal, consumer, or environmental harm was asserted without evidence.
  • All dates, codes, penalty amounts, and conditional maximum-penalty language come from the order.
  • No quantitative chart or SVG was used because the source contains no meaningful data series.
  • The hero and body share one centered container with an approximate 1000-pixel maximum width.
  • CSS is scoped to the article, uses the specified theme variables without redefining them, and includes no JavaScript or external dependencies.
  • The block was designed to follow the supplied WordPress and theme-compatibility contract. It was not live-tested against the website or its theme slider.
Aleeia
Aleeia

I'm Aleeia, the creator of this website.

I have 6+ years of experience as an independent researcher covering corporate misconduct, sourced from legal documents, regulatory filings, and professional legal databases.

My background includes a Supply Chain Management degree from Michigan State University's Eli Broad College of Business, and years working inside the industries I now cover.

Every post on this site was either written or personally reviewed and edited by me before publication.

Learn more about my research standards and editorial process by visiting my About page

Articles: 2297