Hazardous waste enforcement | Memphis
Inside the Hazardous Waste Controls EPA Says Failed at Minasolveβs Memphis Plant
Inspectors recorded damaged outdoor containers, open lamp boxes, missing emergency equipment and incomplete records. The resulting settlement imposes a $100,000 civil penalty, but contains no admission of the alleged violations.
The pile behind Building 85
The most consequential observation was outside. Behind Building 85, inspectors recorded hundreds of containers that Minasolve had designated as βwork in process,β or WIP. The containers were exposed to the elements. According to the order, some were crushed, bulging or corroding, and containers lacked labels identifying or dating their contents.
Minasolve represented that the material was being accumulated for recycling or reclamation back into manufacturing. That distinction mattered. Hazardous waste generators can face different controls depending on whether a material remains usable in production or has become discarded waste subject to hazardous waste rules.
The order says Minasolve did not provide enough information during the inspection to demonstrate that the material could be used directly in production or in support of production operations. After the inspection, the company reevaluated the containers and shipped 85,080 pounds off site for management as hazardous waste.
The EPA consequently alleged that Minasolve had accumulated hazardous waste behind the building for more than 90 days without a permit or interim status. Minasolve did not admit that allegation, but it waived its right to contest the allegations in this proceeding.
The problems extended through the waste-control system
Minasolve manufactures intermediates and solvents for pharmaceutical, rubber and agricultural markets. The order identifies the facility as a large quantity generator, meaning it generates at least 1,000 kilograms of hazardous waste in a calendar month. It generated ignitable D001 hazardous waste, among other waste types, as well as universal waste.
EPAβs allegations covered much more than the outdoor containers.
Containers did not carry complete warnings
- A closed 1,000 milliliter laboratory-waste container was marked βflammableβ but not βHazardous Waste.β
- A closed 1,800 milliliter container carried the βHazardous Wasteβ label but no indication of the contentsβ hazard.
Inspection and reporting records were incomplete
- Minasolve did not provide documentation of weekly inspections for the Railcar central accumulation area.
- Inspectors identified inaccurate or incomplete entries for three waste streams in the 2023 annual report.
Emergency readiness was questioned
- Required fire and spill-control equipment was not in the vicinity of the QC Laboratory and Main accumulation areas.
- The contingency plan lacked a complete, current equipment list with locations, descriptions and capabilities.
- The company could not provide records showing that its amended January 2024 plan and quick reference guide had been sent to local emergency responders.
Universal waste controls were also cited
- Two cardboard boxes of waste lamps, one approximately four feet long and one eight feet long, were open.
- An eight-foot lamp container lacked the required waste label, and another lacked a start date or proof of accumulation time.
- A 55-gallon aerosol-can container carried an accumulation start date of January 13, 2022, more than one year before the inspection.
How missed conditions became permit allegations
Large quantity generators do not necessarily need a hazardous waste storage permit for every container held on site. Federal and Tennessee rules provide limited accumulation exemptions. At this facility, those exemptions depended on meeting specific operating conditions.
Temporary accumulation
A large quantity generator may generally accumulate hazardous waste on site for 90 days or less without a storage permit.
Conditions still apply
Labels, weekly inspections, emergency equipment and current contingency planning are among the required controls.
EPAβs legal theory
For several allegations, the EPA said missing conditions meant the company did not qualify for the exemption and was storing hazardous waste without a permit or interim status.
Universal waste has a separate, streamlined framework. Lamp packages must remain closed, carry prescribed waste labels and generally cannot be accumulated longer than one year without a qualifying exception. A handler must also be able to demonstrate how long the waste has been held.
The order identifies risk controls, not documented injuries
The source does not report that a worker or resident was injured. It does not identify a fire, explosion, spill, broken lamp release or measured contamination caused by the cited conditions. It also does not quantify exposure to hazardous material.
What the safeguards are designed to do
Labels tell workers and emergency personnel what a container holds and what hazards it presents. Inspections are intended to identify leaks and deteriorating containers. Fire and spill equipment provides immediate response capacity. A current contingency plan gives the facility and outside responders an organized course of action if a fire, explosion or release threatens human health or the environment.
The responder issue requires particular care. The order does not establish that local responders lacked every piece of relevant information. It says Minasolve was unable during the inspection to provide records demonstrating that the amended contingency plan and quick reference guide had been submitted to them.
These distinctions matter. The settlement documents alleged failures in preventive systems. It does not establish that the risks those systems address became actual harm in this case.
From inspection to final order
The 55-gallon aerosol-can container observed later by inspectors carried this accumulation start date.
EPA and the Tennessee Department of Environment and Conservation conducted the compliance inspection.
EPA mailed Minasolve an opportunity-to-show-cause letter and the inspection report.
Minasolve submitted a response. The consent order does not describe the substance of that response.
Minasolve and EPA signed the agreement, the Regional Judicial Officer approved it, and the final order was filed on September 22.
What Minasolve agreed to, and what it did not admit
The settlement simultaneously began and concluded the administrative enforcement proceeding. Minasolve admitted EPAβs jurisdiction, consented to the penalty and conditions, and waived its rights to contest the allegations or appeal the final order.
It did not admit or deny the factual allegations. The agreement expressly says the settlement was entered without an admission of violation or an adjudication of the disputed facts and law.
The $100,000 amount should not be read as a monetary valuation of environmental damage. The order presents it as a civil penalty and does not document compensable injury or quantify remediation costs.
What the order leaves unresolved
- The document does not explain how each cited condition was corrected.
- It does not disclose the evidence supporting Minasolveβs ability-to-pay claim or how that claim affected the final penalty.
- Because the order creates a future 180-day obligation, it does not establish that the required follow-up compliance certification has been submitted.
- It does not report environmental sampling, worker exposure data or a documented release connected to the alleged violations.
A failure pattern measured in layers
The significance of the EPAβs account lies in accumulation: a missing label, absent inspection records, emergency equipment gaps, outdated planning details, open lamp boxes and hundreds of outdoor containers whose regulatory status was not demonstrated during the inspection.
No single observation in the order proves that a disaster occurred. Together, however, they show why hazardous waste regulation relies on overlapping controls. When one layer fails, another is supposed to catch the problem. EPA alleged that multiple layers were missing at the same facility.
Explore by category
Antitrust
Monopolies and anti-competition tactics used to crush rivals.
View Cases →Product Safety Violations
When companies sell dangerous goods, consumers pay the price.
View Cases →Environmental Violations
Pollution, ecological collapse, and unchecked greed.
View Cases →Labor Exploitation
Wage theft, worker abuse, and unsafe conditions.
View Cases →Data Breaches & Privacy
Misuse and mishandling of personal information.
View Cases →Financial Fraud & Corruption
Lies, scams, and executive impunity that distort markets.
View Cases →Intellectual Property
IP theft that punishes originality and rewards copying.
View Cases →Misleading Marketing
False claims that waste money and bury critical safety info.
View Cases →