Environmental enforcementFinal consent order
EPA Alleged 12 PCB Violations at Hydrodec. The Settlement Costs $144,484
Inspectors described PCB waste outside approved containment, missing warning labels and inspection records, open containers, obstructed access and a leak at Hydrodecβs mineral oil refining facility in Canton, Ohio.
What the order says
- EPA Region 5 alleged 12 violations arising from a May 14, 2024 inspection of Hydrodec of North Americaβs Canton facility.
- Inspectors estimated that items cited outside approved storage areas in Buildings A, F and G contained 2,091 gallons of PCBs or PCB-contaminated oil.
- The alleged failures included inadequate containment, missing warning labels and disposal dates, unavailable inspection records, open or unsuitable containers, pallet overhang and inadequate aisle space.
- Inspectors also reported a release of less than one gallon from a bushing containing PCBs at 50 parts per million or more.
- The final order assesses a $144,484 civil penalty. A 36-installment plan would bring the scheduled total to $159,233.42 with interest.
- Hydrodec neither admitted nor denied the factual allegations, but consented to the penalty, waived its right to contest the matter and certified that it was complying with applicable PCB rules.
This was not one paperwork lapse. EPAβs counts described failures across the physical and administrative controls intended to govern PCB waste.
In Building A, EPA inspectors said they found eleven PCB articles, three PCB transformers and a 55-gallon container outside the storage area approved for that waste. The items were estimated to contain 1,881 gallons of PCBs and PCB-contaminated oil. Most were sitting directly on the floor rather than within the containment arrangement identified in Hydrodecβs federal approval.
The inspection account did not stop there. EPA described another 15 articles containing an estimated 150 gallons in Building F, plus a 55-gallon container and a 10-gallon bucket containing an estimated 60 gallons in Building G. It alleged that none of these locations provided the approved storage conditions required for disposal-bound PCB items.
The approved system and the conditions EPA described
Hydrodec operates a mineral oil refining facility and held federal approval to store and treat PCB waste. EPA granted that approval in January 2018 and modified it twice in 2021. The approval identified specific storage areas, including Dike C and Building A, and imposed conditions governing containment, labels, inspections, container placement and access.
Building Aβs designated PCB storage area was described in the approval application as a concrete containment structure, with PCB items supported on racks above it and protected by the buildingβs roof. The approval authorized storage of drums, totes and PCB articles containing up to 880 gallons in that designated area.
Specific areas and containment conditions
Hydrodecβs authorization identified where PCB waste could be stored and required storage units to meet federal standards, including curbing, appropriate flooring and containment.
Waste beyond the approved footprint
EPA alleged that disposal-bound items were stored directly on floors or in unauthorized locations in Buildings A, F and G, outside the areas described in Hydrodecβs approval.
Where EPA estimated the cited liquid volume
Twelve counts show how the safeguards allegedly failed
The PCB rules cited in the order do more than designate a room. They require physical containment, visible hazard markings, readable disposal dates, periodic leak checks, appropriate containers and enough aisle space for inspection and spill response. EPAβs allegations reached across each of those layers.
| Counts | Control area | What EPA alleged |
|---|---|---|
| 1 to 3 | Storage and containment | PCB items designated for disposal were stored outside approved areas in Buildings A, F and G without compliant floors and continuous curbing. |
| 4 to 6 | Hazard markings | Required large PCB labels were absent from storage areas in Buildings A, F and G and from an outdoor roll-off container and its storage area. |
| 7 and 8 | Inspection and dating records | Hydrodec could not provide 10 inspection records from the prior 30 months, while three transformers, one container and 13 PCB items lacked removal-from-service dates. |
| 9 to 12 | Leaks, containers and access | EPA reported a leak, unsuitable and open containers, four containers extending beyond pallet edges, and inadequate aisle space for inspection and spill response. |
One alleged violation moved beyond the possibility of a release. Inspectors reported seeing less than one gallon leak from a bushing containing PCBs at concentrations of at least 50 parts per million. Under the cited regulation, an uncontrolled discharge at that concentration constitutes disposal. EPA therefore alleged improper disposal under federal PCB rules.
The order does not describe an injury, human exposure, contamination beyond the facility or a cleanup tied to that leak. It also does not provide environmental sampling results. The documented consequence is the regulatory violation alleged by EPA, not a demonstrated public health outcome.
- ContainmentCurbs, nonporous floors and controlled storage areas are intended to confine liquid and prevent it from leaving the storage unit.
- IdentificationWarning labels and disposal dates allow workers and inspectors to identify regulated items and track how long they have been out of service.
- MonitoringLeak checks at least every 30 days create a record of whether stored items and containment structures were inspected.
- AccessAisle requirements preserve room to inspect containers and respond to a leak instead of forcing responders around tightly packed pallets.
EPAβs account describes a control system weakened in several places at once: where the waste sat, how it was contained, whether it was labeled, whether checks were documented and whether responders could reach it.
The penalty stretches across three years
Hydrodec consented to a civil penalty of $144,484. EPA said it considered the nature and gravity of the alleged violations, culpability, compliance history, ability to continue doing business and other statutory factors. The agency also analyzed Hydrodecβs financial information and determined that the company had a limited ability to pay.
The resulting schedule allows payment in 36 installments. With $14,749.42 in scheduled interest, the order lists a total of $159,233.42. Hydrodec may instead pay the full $144,484 within 30 days of filing and avoid interest, or later pay the remaining principal and accrued charges early.
| Assessed civil penalty | $144,484.00 |
|---|---|
| Installments | 36 payments at 30-day intervals |
| Scheduled interest | $14,749.42 |
| Scheduled total | $159,233.42 |
| Early payment option | Full penalty within 30 days of filing to avoid interest |
Late payments can trigger additional interest, handling charges and a six percent annual late penalty on debts delinquent for more than 90 days. The order also allows collection actions if Hydrodec does not follow the schedule.
Hydrodec accepted the order without admitting the allegations
The settlement was reached without a complaint being litigated and without adjudication of any factual or legal issue. Hydrodec admitted EPAβs jurisdiction but neither admitted nor denied the factual allegations. It waived a hearing, any right to contest the allegations and its right to appeal the final order.
That distinction matters. The final order conclusively establishes Hydrodecβs obligation to pay the agreed penalty. It does not convert every factual allegation into an admitted fact or a finding reached after a contested hearing.
Hydrodec also certified in the agreement that it was complying with the Toxic Substances Control Act and the federal PCB regulations. The document does not detail the physical changes, record reconstruction or operational measures behind that certification.
From permit approval to final order
Hydrodec submitted its application for federal approval to treat and commercially store PCB waste.
EPA granted the treatment and storage approval.
EPA modified the approval, including authorization tied to designated storage areas and capacity limits.
EPA inspectors examined PCB waste handling, storage, disposal operations and records at the Canton facility.
The consent agreement and final order was filed, making it effective and concluding the administrative proceeding.
What the settlement resolves, and what it leaves unanswered
The order resolves Hydrodecβs federal civil penalty liability for the violations alleged in this matter. It does not limit the companyβs continuing duty to comply with environmental laws, and it preserves the governmentβs ability to pursue other forms of relief or sanctions for violations of law.
The significance of EPAβs case lies in the combination. A missing label can be treated as paperwork. A blocked aisle can look like housekeeping. A container beyond containment can appear temporary. In this order, however, EPA linked those conditions to a broader system for controlling disposal-bound PCB waste and alleged that multiple parts of that system failed during the same inspection.
The penalty creates a financial consequence. The public record remains less complete on the physical consequence: it documents a small observed leak, but no established injury or off-site contamination, and it gives little detail about how Hydrodec corrected the conditions inspectors described.
Explore by category
Antitrust
Monopolies and anti-competition tactics used to crush rivals.
View Cases →Product Safety Violations
When companies sell dangerous goods, consumers pay the price.
View Cases →Environmental Violations
Pollution, ecological collapse, and unchecked greed.
View Cases →Labor Exploitation
Wage theft, worker abuse, and unsafe conditions.
View Cases →Data Breaches & Privacy
Misuse and mishandling of personal information.
View Cases →Financial Fraud & Corruption
Lies, scams, and executive impunity that distort markets.
View Cases →Intellectual Property
IP theft that punishes originality and rewards copying.
View Cases →Misleading Marketing
False claims that waste money and bury critical safety info.
View Cases →