ReMuriate Agrees to $302,109 EPA Penalty Over Alleged Air Violations

Environmental enforcement | Delta, Ohio

Company-submitted stack tests recorded hydrochloric acid, chlorine and particulate averages above limits in a federally enforceable permit. The settlement resolves EPA penalty claims without an adjudication of the allegations.

Clean Air Act EPA Region 5 Final order filed September 2, 2026

What the order says

  • ReMuriate submitted a February 2022 particulate test averaging 5.891 pounds per hour, compared with a permit limit of 2.57 pounds per hour.
  • All three submitted HCl test averages exceeded the 25 parts-per-million concentration limit. Two of three submitted chlorine test averages exceeded the 6 ppm limit.
  • EPA also alleged that required daily checks for visible emissions were not performed and recorded from March 9, 2020, through June 8, 2022.
  • ReMuriate agreed to pay a $302,109.20 civil penalty within 30 days after the final order was filed.
  • The company neither admitted nor denied the factual statements and allegations, but waived its right to contest them in this proceeding or appeal the order.
  • The document does not establish off-site pollution levels, injuries or other specific harm to nearby residents.

The numbers document test results above permit limits. They do not, by themselves, establish continuous emissions at those levels throughout EPA’s full alleged violation period.

One chlorine test submitted by ReMuriate averaged 80.27 parts per million. The company’s federally enforceable air permit capped chlorine at 6 ppm. That is more than 13 times the permitted concentration.

The February 11, 2022, result was not the only number above a permit limit at ReMuriate’s hydrochloric acid and iron oxide regeneration plant at 6191 County Road 10 in Delta, Ohio. According to a final EPA settlement, submitted tests also recorded HCl and particulate averages above their respective limits.

EPA turned those results, along with an alleged breakdown in daily visible-emissions checks, into five Clean Air Act allegations. ReMuriate did not admit the allegations, but it accepted a six-figure penalty, waived its right to contest them and agreed not to appeal.

The submitted averages were sometimes far above the limits

ReMuriate’s 2014 permit set three relevant emission limits for its acid regeneration system: HCl could not exceed an outlet concentration of 25 ppm, chlorine could not exceed 6 ppm, and particulate emissions could not exceed 2.57 pounds per hour.

$302,109.20 Civil penalty ReMuriate agreed to pay Payment due within 30 days of filing
5.891 lb/hr Submitted particulate test average 2.29 times the 2.57 lb/hr limit
80.27 ppm Highest submitted chlorine test average 13.38 times the 6 ppm limit
Permit limits compared with test averages listed in the EPA order
Pollutant and datePermit limitSubmitted averageRatio to limit
Particulate, Feb. 11, 20222.57 lb/hr5.891 lb/hr2.29 times
HCl, Feb. 11, 202225 ppm50.87 ppm2.03 times
HCl, March 17, 202225 ppm54.70 ppm2.19 times
HCl, May 12, 202225 ppm58.22 ppm2.33 times
Chlorine, Feb. 11, 20226 ppm80.27 ppm13.38 times
Chlorine, March 17, 20226 ppm23.80 ppm3.97 times
Chlorine, May 12, 20226 ppm0.15 ppmBelow limit

Ratios are calculated from figures in the order and rounded to two decimal places. Parts per million is abbreviated as ppm. The particulate result came from a Method 5 test, while the HCl and chlorine figures came from Method 26A tests.

EPA asked for daily-check records. ReMuriate said it had none to provide.

The permit did not rely only on occasional stack testing. When its iron oxide material-handling operation was running, ReMuriate was required to check every day for visible particulate emissions from associated baghouse stacks and for fugitive particulate emissions from egress points. The presence or absence of visible emissions had to be entered in an operations log.

During its June 2022 inspection, EPA requested opacity or visible-emissions records and other operating records. According to the settlement, ReMuriate responded that it had no responsive documents.

EPA alleged that the company failed to perform and record both categories of daily checks from March 9, 2020, through June 8, 2022. Because the matter settled without adjudication, the final order records that claim as an allegation, not as a litigated factual finding.

  • The baghouse-stack checks concerned visible particulate emissions.
  • The egress-point checks concerned visible fugitive particulate emissions.
  • Both checks were required on operating days and had to be documented.
  • The absence of responsive records does not itself establish how much particulate pollution, if any, left the facility on a particular day.

Testing in 2022 led to a final settlement four years later

  1. Ohio EPA issued the operating permit containing the daily-check duties and emission limits cited in the federal case.

  2. This is the start date EPA used for its allegations concerning the required daily visible-emissions checks.

  3. The submitted particulate, HCl and chlorine tests listed in the settlement were conducted during this period.

  4. EPA inspected the Delta facility and requested emissions tests, visible-emissions records and other operating records.

  5. EPA issued a notice of violation. Representatives of EPA and ReMuriate later conferred on October 12.

  6. EPA’s three allegations involving the HCl, chlorine and particulate limits run through this date.

  7. Ohio EPA issued a renewed permit with provisions the settlement describes as generally equivalent to the 2014 permit.

  8. The consent agreement and final order was filed, making the $302,109.20 settlement effective.

No admission, no trial, and no appeal

The settlement was entered without adjudication of any issue of law or fact. For this proceeding, ReMuriate admitted EPA’s jurisdiction but neither admitted nor denied the factual statements or alleged violations.

β€œneither admits nor denies any statement of fact, including the allegations stated in Section E”ReMuriate’s stipulated position in the consent agreement

At the same time, the company agreed that the order stated a claim upon which relief could be granted. It waived a hearing, waived the right to contest the allegations, waived judicial or administrative review and waived an appeal.

EPA said it calculated the penalty using Clean Air Act factors, its stationary-source civil penalty policy, the facts of the case and ReMuriate’s cooperation. The order does not break down how much of the penalty corresponds to each allegation.

Payment is due within 30 days of the filing date. The document describes interest and additional collection measures if payment is late, but it does not establish that payment has already been made.

The permit was enforceable. The order does not quantify community exposure.

Ohio’s air-permit program is part of a federally enforceable state plan designed to implement and maintain national ambient air-quality standards. That made ReMuriate’s permit conditions enforceable by EPA under the Clean Air Act.

The permit’s daily checks and numerical limits were compliance controls. The checks were meant to create a regular record of whether visible emissions appeared, while the stack tests measured particular pollutants under test conditions.

The supplied order does not report ambient air measurements around the facility. It does not identify injuries, illnesses, property damage or a specific off-site exposure caused by ReMuriate’s emissions. It also does not quantify how much pollution was released across EPA’s alleged violation periods.

Those limits matter. They prevent the test results from being turned into unsupported claims about continuous emissions or demonstrated harm to nearby people.

The penalty closes a defined case, not every compliance question

Once ReMuriate completes the settlement terms, the agreement resolves only its federal civil-penalty liability for the violations specifically alleged in the document. It does not relieve the company of its duty to comply with federal, state or local law, and it does not prevent EPA from pursuing other violations.

The settlement also references an administrative compliance order issued concurrently under the same docket number. That document was not included in the supplied material, so this record does not show what corrective work, testing, reporting or operating changes it may require.

Unresolved in the supplied record

  • Whether ReMuriate’s current emissions comply with the renewed 2024 permit.
  • What evidence supports EPA’s alleged emissions-limit violations through July 23, 2023, beyond the listed 2022 tests.
  • What corrective measures are required by the separate compliance order.
  • Whether the assessed penalty has been paid.

The settlement establishes a penalty and ends the administrative proceeding. It leaves the most practical question outside the supplied record: whether the plant’s present-day emissions and monitoring now meet the limits that generated the case.

Source: U.S. Environmental Protection Agency Region 5, Consent Agreement and Final Order, In the Matter of ReMuriate Delta, LLC, Docket No. CAA-05-2026-0041, filed September 2, 2026.

This article relies solely on that order. The referenced concurrent administrative compliance order was not supplied, and the settlement did not adjudicate the alleged violations.

Aleeia
Aleeia

I'm Aleeia, the creator of this website.

I have 6+ years of experience as an independent researcher covering corporate misconduct, sourced from legal documents, regulatory filings, and professional legal databases.

My background includes a Supply Chain Management degree from Michigan State University's Eli Broad College of Business, and years working inside the industries I now cover.

Every post on this site was either written or personally reviewed and edited by me before publication.

Learn more about my research standards and editorial process by visiting my About page

Articles: 2307