A federal consent agreement says inspectors found an open and unlabeled container of used lamps, two drums stored where they were not permitted, and gaps in inspection and training records at Chemoursβ Belle, West Virginia facility.
What the settlement says
- EPA resolved five alleged violations involving universal waste lamps, unpermitted drum storage, inspection records, and hazardous waste training documentation.
- The first two counts came from the same container: inspectors reported that it was open and lacked an approved waste-lamp label.
- EPA alleged that two 55-gallon drums, one containing hazardous waste and one containing solid waste, were stored in a part of the VAZO area where the permit prohibited them.
- Chemours could not provide weekly inspection records for four specified weeks between October 2021 and August 2023.
- The company also lacked documentation showing the required 2021 annual hazardous waste training review for six facility personnel.
- Chemours consented to a $9,508 civil penalty and certified that it was currently in compliance concerning the alleged violations.
On August 14, 2024, EPA inspectors reported finding used electric lamps sitting in an open container at Chemoursβ chemical intermediates manufacturing facility in Belle. Lamps were not being added or removed when inspectors observed it, according to the settlement. The same container had no approved wording identifying its contents as used or waste lamps.
Elsewhere in the facility, inspectors found two 55-gallon drums in the VAZO hazardous waste storage area. One held hazardous waste and the other held solid waste. EPA alleged that neither belonged among the narrowly defined wastes the facilityβs permit allowed in that unit.
The inspection also extended into the records behind the physical controls. EPA said Chemours failed to maintain inspection records for four weeks and lacked required documentation of annual refresher training for six workers whose positions involved hazardous waste management.
Why an open lamp container became an enforcement count
Used lamps fall under universal waste rules, a regulatory system for certain commonly generated hazardous wastes. The rules are less extensive than the full hazardous waste regime, but they still require safe containment and clear identification.
The settlement describes Chemours as a small quantity handler of universal waste lamps. That status required structurally sound packaging designed to prevent breakage. Containers also had to stay closed and show no damage that could cause leakage under reasonably foreseeable conditions.
Such containers and packages must remain closed and must lack evidence of leakage, spillage or damage that could cause leakage under reasonably foreseeable conditions.
EPA said the open container violated that requirement. The agency brought a separate count because the container was not marked with one of the permitted descriptions for universal waste, used, or waste lamps.
The agreement does not state how many lamps were in the container, what kind they were, whether any were broken, or whether anything leaked. It also notes that the container was outside the areas governed by the facilityβs 2024 RCRA permit. That did not remove it from regulation. West Virginiaβs universal waste rules still applied.
Five counts, but not five separate incidents
The enforcement action combined physical storage issues with record-keeping failures. Two counts arose from one lamp container, while the other three addressed drums and documentation.
Open universal waste container
EPA inspectors observed used lamps in an open container while no lamps were being added or removed.
EPA allegation resolved by settlementMissing waste-lamp label
The same container did not carry any of the approved descriptions identifying the lamps as universal waste, waste, or used lamps.
EPA allegation resolved by settlementTwo prohibited 55-gallon drums
EPA alleged that one hazardous waste drum and one solid waste drum were stored in the VAZO area even though the permit prohibited those wastes there.
EPA allegation resolved by settlementFour weeks of missing inspection records
The agreement identifies October 17 to 23, 2021; April 3 to 9, 2022; April 10 to 16, 2022; and August 13 to 19, 2023.
EPA allegation resolved by settlementNo documentation of annual refresher training
Chemours could not produce records documenting the required 2021 annual hazardous waste training review for six personnel. The allegation concerns the failure to maintain proof, not an express finding that no training occurred.
EPA allegation resolved by settlementInspection logs are part of the safety system
The missing paperwork was not merely administrative in the permitβs design. Chemoursβ inspection schedule called for weekly reviews of the VAZO waste area. The permit required the company to look for malfunctions, deterioration, operator errors, and discharges that could release hazardous waste constituents or threaten human health.
The Permittee must conduct these inspections often enough to identify problems in time to correct them before they harm human health or the environment.
Records make those checks auditable. Without them, regulators cannot readily verify what was examined, what conditions were found, or whether corrective work followed. In this case, the agreement says Chemours failed to maintain weekly records for four periods. It does not connect those missing records to a documented release or injury.
The training records served a similar verification role. Facility personnel in hazardous waste positions were required to review their initial training annually, while the company had to retain the documentation. EPAβs case establishes an alleged documentation failure for six people. The supplied record does not say that any worker mishandled waste because of inadequate training.
From inspection to final order
The agreement says documentation of annual refresher training for six hazardous waste personnel was not maintained.
Four specified weeks of VAZO area inspection records were not maintained.
A reissued RCRA permit for the facility took effect.
EPA conducted its compliance evaluation inspection. The lamp container and two drums were documented on August 14.
EPA notified the West Virginia Department of Environmental Protection of its intent to begin the federal administrative action.
The final order was filed, ratifying the consent agreement and making it effective.
What Chemours agreed to, and what it did not admit
Chemours admitted EPAβs jurisdiction for the proceeding but neither admitted nor denied the specific factual allegations. It agreed not to contest jurisdiction, waived its right to contest the allegations or appeal the final order, and consented to the penalty.
The $9,508 payment was due within 30 days of the September 28, 2026 effective date. The agreement states that EPA considered the statutory penalty factors, but it does not provide a count-by-count calculation explaining how the agency reached that amount.
Chemours also certified, based on personal investigation and to the best of its knowledge and belief, that it was currently in compliance regarding the alleged violations. The supplied order does not describe a separate cleanup project, independent monitoring program, or quantified remediation requirement.
The settlement resolves only EPAβs civil penalty claims for the five specified violations. It does not relieve Chemours of other legal obligations, and EPA reserved its authority to address other conditions or enforce the settlement.
What the public record does not establish
- It does not identify any release, spill, broken lamp, worker exposure, off-site contamination, injury, or environmental cleanup associated with the cited conditions.
- It does not specify the number or type of lamps in the open container.
- It does not identify the contents of the drums beyond describing one as hazardous waste and the other as solid waste.
- It does not establish that the six personnel missed training. It establishes an alleged failure to maintain documentation of the required review.
- It does not itemize how much of the $9,508 penalty corresponded to each count.
Hazardous waste controls often look ordinary: a closed container, a readable label, the correct storage location, a signed inspection log, a retained training record. EPAβs final order documents alleged breakdowns across each of those layers at Belle. It also leaves an important boundary intact: the settlement establishes a payment obligation and closes the listed civil penalty claims, but it does not document that those failures caused a release or harmed anyone.
Explore by category
Antitrust
Monopolies and anti-competition tactics used to crush rivals.
View Cases →Product Safety Violations
When companies sell dangerous goods, consumers pay the price.
View Cases →Environmental Violations
Pollution, ecological collapse, and unchecked greed.
View Cases →Labor Exploitation
Wage theft, worker abuse, and unsafe conditions.
View Cases →Data Breaches & Privacy
Misuse and mishandling of personal information.
View Cases →Financial Fraud & Corruption
Lies, scams, and executive impunity that distort markets.
View Cases →Intellectual Property
IP theft that punishes originality and rewards copying.
View Cases →Misleading Marketing
False claims that waste money and bury critical safety info.
View Cases →