EPA Region 3 | Final agency order
Open Containers, Broken Lamps, a $5,000 Order at a Navy Medical Facility
EPA inspectors reported hazardous-waste controls failing across dental, pharmacy and building operations at Naval Support Activity Bethesda. The Navy settled, certified that the alleged violations were corrected and neither admitted nor denied the specific factual allegations.
Inside a federal medical training facility, EPA inspectors said they encountered hazardous-waste containers left open, expired products that were not marked as hazardous waste and broken fluorescent lamps without containment. Those were not isolated descriptions in an inspection memo. They became the foundation of a final federal order.
Naval Support Activity Bethesda operates the facility, which trains medical professionals for careers in the Department of Defense and the Public Health Service. According to the agreement, the site generates and stores a broad range of hazardous waste, including ignitable solvents, acids and bases, reactive waste, acute hazardous waste and toxic waste. Maryland has classified it as a large quantity generator since 2008.
The central issue was not simply that hazardous material existed at the site. Facilities of this kind are allowed to generate and store regulated waste. The issue was whether basic controls governing where waste could accumulate, how containers had to be closed and labeled, and how breakable lamps had to be managed were actually being followed.
What inspectors reported in the waste areas
The settlement describes problems in multiple parts of the facility rather than at a single container or workstation. Each observation implicated a different safeguard in Maryland’s federally authorized hazardous-waste program.
Dental amalgam moved away from its generation point
Inspectors observed amalgam traps in dental chairs in the Prosthodontics Dentistry room and Prosthodontics/Endodontics Room 1402. Once removed, the amalgam was taken to a satellite accumulation area in a separate room. EPA said this did not meet the condition requiring qualifying waste to accumulate at or near its point of generation and under the operator’s control.
An open container held discarded warfarin bottles
In a satellite accumulation area at the Hospital-America Pharmacy, the inspector reported an open container labeled “Hazardous Waste” that held warfarin bottles. The agreement characterized the material as acute toxic waste. Hazardous-waste containers generally had to remain closed except when waste was being added or removed.
Used and broken lamps were not properly contained
In Building 15, inspectors reported used lamps in an open container. They also observed uncontainerized and broken waste fluorescent lamps, which EPA cited under a separate rule requiring operation of the facility in a way that minimizes the possibility of fire, explosion or an unplanned hazardous release.
Expired products lacked hazardous-waste labels
Containers in the Comprehensive Dentistry satellite accumulation area were not marked with the words “Hazardous Waste,” according to the agreement. Listed examples included 3M Avagard hand antiseptic, Purell hand sanitizer and Metrex Research CaviCide 1.
How routine handling became an enforcement case
- Dental, pharmacy and building operations generated regulated waste.
- Location, closure, labeling and containment rules governed how that waste could accumulate.
- EPA inspectors reported departures from those safeguards during a two-day inspection.
- EPA said the departures defeated relevant permit-exemption conditions and supported a separate safety violation.
Why EPA called it operation without a permit
The agreement says Maryland issued the facility Controlled Hazardous Substance Facility Permit A-221 in June 2021, with an expiration date in June 2031. It also says the acts and omissions observed in May 2025 prevented Naval Support Activity Bethesda from meeting regulatory permit-exemption conditions. EPA consequently alleged that the facility operated without a permit on those inspection dates.
The document does not fully explain how the scope of the existing storage permit interacted with the specific satellite accumulation and exemption requirements at issue. What it does make clear is EPA’s legal conclusion: the observed waste-handling practices did not qualify for the exemption on which those activities depended.
This distinction matters. The enforcement record does not say that the facility had never received any hazardous-waste permit. It says particular acts and omissions caused the operation observed by inspectors to fall outside the relevant permit exemption.
The order identifies risk, not a documented injury
The cited safeguards are designed to prevent waste from being misplaced, spilled, mixed, exposed or otherwise mishandled. The agreement specifically invokes the possibility of fire, explosion and sudden or gradual releases to air, soil or surface water that could threaten people or the environment.
What the available record does not establish
EPA’s settlement does not report that a fire, explosion or release occurred. It does not identify an injured worker, patient or visitor, and it provides no sampling results, exposure measurements, cleanup costs or environmental damage assessment. Those outcomes should not be inferred from the violations alone.
That limitation does not erase the compliance failure described by EPA. Container closure, accurate labels and intact lamp storage are preventive controls. Their purpose is to stop a handling mistake from becoming an exposure or release. The enforcement document establishes EPA’s findings about those controls, not proof of a resulting health or environmental injury.
The Navy settled without admitting the specific facts
The legal outcome combined a final penalty with carefully limited admissions. Naval Support Activity Bethesda admitted EPA’s jurisdiction, agreed not to contest the order, waived a hearing and appeal, and consented to comply with the settlement. It did not admit the specific factual allegations.
“Neither admits nor denies the specific factual allegations in this Agreement.”Expedited Settlement Agreement, paragraph 17
The Navy certified that “the alleged violations have been corrected.”Expedited Settlement Agreement, paragraph 19
The certification is significant, but the supplied order does not describe the corrective work. It does not say whether containers were replaced, waste areas were relocated, labels were added, lamps were removed, staff were retrained or EPA conducted a follow-up inspection.
The final order required a $5,000 civil penalty and compliance with the settlement’s terms. The Navy was directed to submit payment instructions within 30 days of the effective date. The order is final agency action for the alleged violations observed during the May 2025 inspection, but EPA retained rights to address other violations and conditions it determines may present an imminent and substantial danger.
From generator status to final order
The facility notified Maryland that it was a large quantity generator of hazardous waste.
Maryland issued Controlled Hazardous Substance Facility Permit A-221, which the agreement says expires June 20, 2031.
EPA conducted its compliance evaluation inspection and made the observations described in the settlement.
EPA notified the Maryland Department of the Environment of the planned enforcement action.
EPA filed the settlement and final order, making the $5,000 penalty and settlement terms final agency action.
What the final order leaves unanswered
The settlement closes EPA’s civil-penalty claims for violations observed during the inspection, but the document alone does not provide a complete picture of what changed afterward.
- What specific corrective actions were taken in each dental, pharmacy and building waste area?
- Did EPA or Maryland independently verify the Navy’s correction certification?
- How did the existing state permit apply to the areas and activities EPA said failed the exemption conditions?
- Was the $5,000 penalty paid within the required period?
The record does not document a spill or an injury. It documents something more basic: preventive controls failed at several ordinary points in a large hazardous-waste operation. The final financial consequence was $5,000, while the public order provides no detailed account of the repairs, retraining or verification behind the Navy’s certification that the alleged violations were corrected.
Explore by category
Antitrust
Monopolies and anti-competition tactics used to crush rivals.
View Cases →Product Safety Violations
When companies sell dangerous goods, consumers pay the price.
View Cases →Environmental Violations
Pollution, ecological collapse, and unchecked greed.
View Cases →Labor Exploitation
Wage theft, worker abuse, and unsafe conditions.
View Cases →Data Breaches & Privacy
Misuse and mishandling of personal information.
View Cases →Financial Fraud & Corruption
Lies, scams, and executive impunity that distort markets.
View Cases →Intellectual Property
IP theft that punishes originality and rewards copying.
View Cases →Misleading Marketing
False claims that waste money and bury critical safety info.
View Cases →