EPA Says Required Safeguards Were Missed at Four West Virginia Gasoline Tanks

Underground tank enforcement

EPA Says Required Safeguards Were Missed at Four West Virginia Gasoline Tanks

An EPA settlement identifies repeated gaps in release monitoring, walkthrough inspections, spill prevention equipment and correction records. The tank owner and operator agreed to pay $11,024 and certified that the cited problems had been corrected.

Four underground tanks installed around November 1988 were capable of holding a combined 24,000 gallons of gasoline beneath the Umstott 34915 facility in Petersburg. According to EPA, the systems repeatedly went without required checks or controls during specified periods in 2023 and 2024.

The agency’s account did not begin and end with a paperwork error. It covered the recurring tasks meant to show whether tanks were releasing fuel, whether the facility was being inspected, whether spills could be prevented during operations, and whether identified problems were actually tracked through correction.

4 Underground gasoline tanks Two 6,000-gallon tanks, one 8,000-gallon tank and one 4,000-gallon tank
24,000 Gallons of listed capacity Calculated from the four tank capacities, not the amount of fuel present or released
$11,024 Agreed civil penalty The owner and operator are jointly and severally liable for payment
1988 Approximate installation year The agreement says all four tanks were installed in or about November

The safeguards EPA says went missing

EPA conducted a compliance evaluation inspection on June 27, 2024, then considered additional information supplied by the respondents. The resulting agreement identifies four distinct compliance categories. Each addresses a different point in the system for preventing, detecting or documenting a problem.

Release monitoring

Tank systems had to be monitored for releases every 30 days. EPA identified multiple periods when that monitoring was not performed as required.

Spill prevention equipment

EPA said adequate equipment was not provided for all four tanks on a specified March date and for two tanks during a later period.

Walkthrough inspections

Required operations and maintenance walkthroughs were not conducted every 30 days during two cited periods.

Correction records

EPA said the respondents failed to maintain records describing actions taken to correct issues found during walkthroughs.

The record spans months, not one inspection

The cited periods overlap, but they describe different obligations. Their sequence shows that EPA’s case involved recurring compliance duties rather than a single missed task.

  1. EPA’s alleged recordkeeping failure spans this period, covering records of actions taken to correct issues found during walkthrough inspections.

  2. Tank 1 allegedly went without the required 30-day release monitoring.

  3. EPA cited both missed release monitoring and missed walkthrough inspections for all four tanks.

  4. EPA again cited both monitoring and walkthrough failures for all four tanks.

  5. EPA identified inadequate spill prevention equipment for all four tanks on at least this date.

  6. EPA inspected the facility on June 27 and cited inadequate spill prevention equipment for Tanks 2 and 4 through at least September 6.

  7. The final order was filed, making the agreement effective and requiring compliance with its terms.

The case documents failed safeguards, not a documented spill

Release monitoring, spill prevention equipment, walkthroughs and correction records form a chain. Monitoring is meant to identify a release. Spill controls are intended to prevent fuel from escaping during operations. Walkthroughs create routine opportunities to find problems. Records show what was done after a problem was identified.

When several links are missing, regulators have less assurance that a tank system is being watched and maintained as required. That is the evidence-supported significance of the case. The agreement does not say gasoline leaked, that soil or water was contaminated, or that anyone suffered an injury or financial loss.

That distinction matters. The $11,024 penalty resolves EPA’s civil penalty claims for the listed compliance violations. It should not be read as a quantified measure of environmental damage, because the order identifies no such damage.

The respondents certified correction without admitting the facts

Woodford Development Co. and Umstott, Inc. accepted the settlement structure, waived a hearing and appeal, and agreed not to contest EPA’s jurisdiction. They also certified, subject to civil and criminal penalties for a false submission, that the alleged violations had been corrected and that information supplied to EPA was true and accurate.

β€œNeither admit nor deny the specific factual allegations”
Expedited Settlement Agreement, paragraph 10

The agreement does not describe a separate factual defense from either company. It also does not detail what equipment was replaced, what monitoring procedures changed, when each correction occurred, or whether EPA conducted a later inspection to verify the work.

EPA’s position

The agency identified violations of federal and federally authorized West Virginia underground storage tank requirements.

Respondents’ position

They admitted jurisdiction, but neither admitted nor denied the specific factual allegations.

Final outcome

A final order incorporated the agreement, required compliance and assessed an $11,024 civil penalty due within 30 days.

What the final order resolves, and what it leaves unseen

The settlement closes EPA’s claims for civil penalties arising from the violations listed in the agreement. It does not convert the respondents’ non-admission into an admission, and it does not establish consequences that the record never documents.

The public record establishes three narrow points

  • EPA formally identified recurring compliance failures across four regulatory duties.
  • The owner and operator agreed to pay the penalty and certified that the alleged violations were corrected.
  • The supplied order provides no technical account of the corrections and no evidence of an actual fuel release or resulting harm.

The case therefore ends with a correction certification, not a public engineering record of the repairs. That gap does not prove the tanks remained unsafe, just as the absence of a documented spill does not erase the importance of the safeguards. It defines the boundary of what this settlement allows the public to know.

Primary source: U.S. Environmental Protection Agency Region 3, Expedited Settlement Agreement and Final Order, Docket No. RCRA-03-2026-0021, filed September 9, 2026.

The source identifies Woodford Development Co., LLC as tank owner, Umstott, Inc. as tank operator, and Umstott 34915 in Petersburg, West Virginia as the facility.

Aleeia
Aleeia

I'm Aleeia, the creator of this website.

I have 6+ years of experience as an independent researcher covering corporate misconduct, sourced from legal documents, regulatory filings, and professional legal databases.

My background includes a Supply Chain Management degree from Michigan State University's Eli Broad College of Business, and years working inside the industries I now cover.

Every post on this site was either written or personally reviewed and edited by me before publication.

Learn more about my research standards and editorial process by visiting my About page

Articles: 2328