Inside EPA’s Safety Case Against Citrosuco’s 111,000-Pound Ammonia System

Chemical safety and corporate accountability

Inspectors recorded corroded piping, deficient emergency ventilation, hard-to-reach shutdown controls and a locked exit gate at a Florida citrus facility. Citrosuco settled seven alleged Clean Air Act violations for $179,634.

Citrosuco North America Lake Wales, Florida EPA Region 4 Order filed September 1, 2026

The emergency controls were not where workers would expect them

On the roof, EPA said a pressure-relief pipe was angled to discharge ammonia downward rather than upward. Inside the plant, an emergency shutoff for one machinery room was roughly the length of a football field from the room it controlled. At the front of the property, the primary vehicle exit gate was locked.

Those were three of 27 observations listed in the settlement after EPA inspected Citrosuco North America’s Lake Wales facility on March 7, 2024. The facility operates an ammonia refrigeration plant serving citrus processing operations.

The quantity matters. Citrosuco had 111,000 pounds of anhydrous ammonia on site at the times relevant to EPA’s allegations. Its covered process had a regulatory threshold of 10,000 pounds. That placed the system under the Clean Air Act’s Risk Management Program, which is intended to prevent accidental releases of regulated substances and limit the consequences when releases occur.

111,000 lb Anhydrous ammonia stored or used At times relevant to EPA’s allegations
10,000 lb Risk Management Program threshold For the covered process
27 Engineering and safety observations Listed under EPA’s inspection findings
$179,634 Civil penalty Payable within 30 days of the order’s effective date
Figures are drawn from the EPA consent agreement. The count of 27 refers to listed observations, not 27 separately adjudicated violations.

This was not one isolated paperwork failure

EPA evaluated whether Citrosuco could document that its ammonia process followed recognized and generally accepted good engineering practices, often shortened to RAGAGEP. In plain language, that means the company needed to show that critical equipment was designed, operated, inspected and maintained according to accepted safety standards.

The observations stretched across the physical plant, emergency systems and compliance records.

What EPA recorded
Step 1An ammonia leak or other abnormal condition occurs.
Step 2Gaps, unsealed openings or weak ventilation make containment harder.
Step 3Missing labels, alarms or remote controls can slow recognition and shutdown.
Step 4Restricted exits or deficient emergency equipment can complicate escape and response.
This is a conceptual summary of the safeguards discussed in the order. It does not depict a documented accident or establish that a release occurred.

The corrosion record shows how warnings can remain unresolved

Among the most consequential observations was localized corrosion and pitting on ammonia piping, valves and refrigeration equipment across several areas of the facility. The order says Citrosuco’s last documented evaluation concluding that corroded piping remained safe was a visual inspection performed in 2019.

A later compliance audit in 2022 found that corrosion inspections and testing were not being conducted according to good engineering practices and manufacturer recommendations. The audit recommended adding corrosion inspections to the annual mechanical-integrity program.

By the 2024 inspection, EPA said Citrosuco had no documentation demonstrating that the affected lines remained safe to operate.

β€œRespondent had no documentation demonstrating these lines were safe to operate.” EPA consent agreement, description of corrosion and pitting observations

The same gap appeared at the audit level. Citrosuco completed a facility compliance audit in 2022, but EPA said the company had no documentation showing that it determined an appropriate response to every finding or that the identified deficiencies had been corrected.

A decade-old procedure overstated available ventilation

The facility’s written procedures and its equipment records did not match. One standard operating procedure said ammonia sensors would activate at 150 parts per million and provide at least 20,000 cubic feet per minute of outside air. The ventilation documentation showed that System 1 could provide only 8,000 cubic feet per minute.

The procedure’s footer said it was last reviewed on May 8, 2014. EPA alleged that Citrosuco failed to review procedures as often as necessary and failed to certify annually that they remained current and accurate.

EPA also said documentation available during the inspection did not demonstrate past annual testing of emergency stops and emergency ventilation systems. Citrosuco later supplied records showing that annual testing was conducted on March 28, 2024, later in the same month as the inspection.

The ventilation mismatch

EPA condensed the record into seven alleged violations

The 27 observations were not presented as 27 separate legal violations. EPA grouped its case into seven alleged failures under the Clean Air Act’s chemical accident prevention regulations.

Allegation What EPA said was required Record cited in the order
1 Document that equipment complied with recognized engineering practices. The 27 observations included corrosion, deficient controls, missing alarms and physical plant conditions.
2 Review operating procedures when needed and certify annually that they remained current. A procedure last reviewed in 2014 conflicted with ventilation-capacity records.
3 Ensure inspection and testing procedures followed recognized engineering practices. EPA said Citrosuco could not demonstrate past annual testing of emergency stops and ventilation before the inspection.
4 Determine and document responses to compliance-audit findings and document corrections. The 2022 audit had findings, but EPA said the company lacked records showing responses and completed corrections.
5 Document annual coordination with local emergency authorities. Citrosuco could not provide documentation demonstrating annual coordination.
6 Revise and update the Risk Management Plan at least every five years. The most recent plan was submitted in July 2014, and an update was due by July 2019.
7 Update emergency contact information within one month of a change. The plan named a contact who had left the facility about three years before the inspection.
These were EPA allegations resolved through a consent agreement, not factual findings reached after a contested hearing.

Years passed between the oldest records and the final order

May and July 2014 The cited operating procedure was last reviewed in May. Citrosuco submitted the Risk Management Plan in July.
2019 The last documented evaluation concluding that corroded piping remained safe was performed. A five-year update to the Risk Management Plan was due by July.
2022 A compliance audit identified deficiencies, including problems with corrosion inspections and testing. EPA later said records did not demonstrate responses to every finding or completed corrections.
March 7, 2024 EPA conducted its on-site inspection of Risk Management Program records and equipment.
March 28, 2024 Citrosuco conducted annual testing of emergency stops and emergency ventilation systems and produced an ammonia refrigeration safety checklist.
December 12, 2024 EPA issued a notice of potential violation.
January 14, 2025 EPA and Citrosuco representatives met to discuss the notice.
September 1, 2026 The consent agreement and final order were filed, making the settlement effective.

The human stakes are real, but the record does not document an injury

The order does not say that ammonia was released, that a worker was exposed or that anyone was injured. It also does not identify how many people worked near the covered process.

What it does establish is why the alleged deficiencies mattered to prevention and response. Workers and emergency personnel may rely on alarms to recognize a problem, labels to understand where ammonia is moving, ventilation to remove contaminated air, controls to shut equipment down, and unobstructed exits to leave the area.

Several observations concerned what would happen after something went wrong. The eyewash and shower inside Machinery Room 2 lacked adequate flow. No second unit was outside the room. One roof platform lacked a guardrail, roof grating was unstable, and a locked gate could impede the property’s primary means of emergency egress.

These facts support a finding of potential risk, not a claim that the worst outcome occurred. The supplied record documents alleged weaknesses in layers of protection, not a casualty event.

Citrosuco settled without admitting the factual allegations

Citrosuco agreed to the $179,634 penalty, consented to the order’s conditions, waived its right to contest EPA’s seven allegations and waived an appeal. The company also acknowledged that the order counts as an enforcement action when EPA considers its compliance history in any future case.

At the same time, the agreement states that Citrosuco neither admitted nor denied the factual allegations. A consent order resolves a case without the fact-finding process of a contested hearing, so the distinction matters.

Citrosuco certified, to the best of its knowledge, that it was currently complying with relevant Clean Air Act requirements and that all alleged violations had been corrected. The agreement contains no separate narrative explanation from the company and no item-by-item account of the corrective work.

The company certified that β€œall violations alleged herein, which are neither admitted nor denied, have been corrected.” Consent Agreement and Final Order, paragraph 21(d)

The settlement resolves federal civil-penalty liability only for the violations and facts specified in the order. It does not relieve Citrosuco of ongoing compliance duties or prevent EPA from pursuing other relief authorized by law.

What the settlement resolves, and what it leaves unanswered

The order provides a financial penalty, a binding compliance commitment and a record that can be considered in future enforcement. Those are concrete consequences.

The public document is less specific about the physical transformation of the facility. It does not provide repair invoices, updated engineering drawings, photographs, testing results for each condition or a follow-up inspection confirming every correction.

Unresolved in the supplied record

  • How each of the 27 observed conditions was repaired or otherwise resolved.
  • Whether EPA conducted a follow-up site inspection before accepting the compliance certification.
  • What changes were made to emergency ventilation, shutdown controls, exits and corrosion monitoring.
  • How Citrosuco now documents annual coordination with local emergency planners.

The penalty closes the administrative case. The more important preventive question is whether every safeguard now works as a system: the pipes, alarms, ventilation, controls, procedures and escape routes. Citrosuco certified that the alleged violations were corrected. The consent order itself does not supply the itemized evidence that would allow the public to test that claim.

Source: U.S. Environmental Protection Agency Region 4, Consent Agreement and Final Order, In the Matter of Citrosuco North America, Inc., Docket No. CAA-04-2026-0307(b), filed September 1, 2026. Citrosuco neither admitted nor denied the factual allegations in the agreement.
Aleeia
Aleeia

I'm Aleeia, the creator of this website.

I have 6+ years of experience as an independent researcher covering corporate misconduct, sourced from legal documents, regulatory filings, and professional legal databases.

My background includes a Supply Chain Management degree from Michigan State University's Eli Broad College of Business, and years working inside the industries I now cover.

Every post on this site was either written or personally reviewed and edited by me before publication.

Learn more about my research standards and editorial process by visiting my About page

Articles: 2319